SITE CONDITIONS
Some conditions that may affect the ability perform the testing, or the cost for the service include:
1. Site Induction(s): Inform in advance of any Site Induction requirements, times & location
2. Safety: Ensure a safe working environment
3. Access: Consider any access requirements & coordinate EWP with licensed operator
4. PPE: Please inform Hilti Tester if gumboots are required (in case of mud), or other non-standard PPE are required
5. Installation: Please ensure all anchors have been installed prior to the test, and that Hilti Chemical Anchors have fully cured, otherwise the test may be cancelled or postponed
6. Threaded Rods: More accurate testing is performed on anchor rods which have not been loaded with fixtures/plates; Nuts, washers, plates, fixings, duct tape etc should be removed from the rods by the customer prior to the start of the testing session
7. Rebar: We require a straight bar with a minimum of 350-400mm above the concrete surface
8. Site Support: A customer representative of the client shall accompany testing staff and know the location of the anchors to be tested, witness the process, and counter sign the QA report
9. Lead-in Times: Up to 5 working days’ notice is preferred for scheduling purposes but does vary depending on demand
10. Testing loads: Should be validated by the responsible design engineer prior to the testing date